G. Greene Construction recently completed work at Substation #240 located in Framingham, MA.  The project included excavation and backfill to allow for the installation of several concrete footings.  These footings will serve as the foundations for a new control house, as well as a new transformer.  In addition, G. Greene installed pre-cast Trenwa cable trenching throughout the area.  Our Project Team worked cautiously in this area due to the high voltage power running continuously throughout the substation.