G. Greene Construction completed the below grade work at a new switchyard for Eversource Electric in Kingston, NH.  The project included installation of foundations for new "A" Frame transmission structures and associated electrical switch equipment.  Foundation installation was followed closely by placement of electrical conduit, grounding grid and precast concrete cable trench.  In addition, the project included raising the two acre site with 10,000 cubic yards of fill and installing new perimeter fencing.  We have completed numerous, successful projects for Eversource and we are currently working on substations in Achushnet, New Bedford, Mashpee, Medway, Waltham and Somerville.