Project Overview
The G. Greene site crew successfully designed and constructed a new front entry while realigning existing parking and walkways to enhance the flow of pedestrian traffic. Our project team collaborated closely with the facility staff to ensure that the hospital operated smoothly throughout the process, maintaining a seamless experience for patients, staff, and visitors.
Solutions
G. Greene’s civil division created a detailed phasing plan and committed to working off hours to maintain traffic flow, all while adhering to an aggressive schedule to meet the client’s expectations. Throughout the duration of the project, we ensured that emergency vehicle access was consistently provided.
Results
- Developed and implemented an interim traffic flow pattern for better circulation.
- Constructed a new Versa Lock block retaining wall for enhanced structural support.
- Improved drainage systems to ensure proper water management.
- Completed the construction of new front and entry roads, sidewalks, and an upgraded parking lot.
- Installed curbing and sidewalks and finished the final paving to enhance accessibility and safety.
- Provided comprehensive landscaping to beautify the area and improve its overall aesthetic appeal.